Hi,
Planning the tun drain using SS mesh tube. However I'm unsure how long it needs to be. I was thinking of coiling about a meter on the bottom, but would the adversly affect the flow of liquid throught the grain bed?
Anyone tried this sort of coil idea before?
Si