Want to place an ad email luke@realbeer.co.nz
$50+GST / month
We spoke about creating a discussion so people who have or people who are thinking about and/or building can share pic's info and pitfalls to avoid.
Just about finished building my bench and hopefully will have a chance to start wiring it up this weekend. Pics to follow shortly.
Tags:
Right time for an Update.
Pumps arrived this morning have connected them up and test run them, pretty happy with them fairly quiet.
Alls thats really missing now is my HLT coil and a new 63L pot to match my other 2 new ones.
As for the coil not sure if I'll just plump my current home made imm chiller in (kink and all) and get a new 3/8 imm chiller to use and look at upgrading the coil at a later date.
Current upgrade path is looking like New coil > False Bottom > Final Panel build in proper box > Chuggers/March 809.
And maybe make a proper pump stand even though current one is in style with setup.
Pumps I used are these ones here if you ask for the MP-15RM model when you order you'll get the one with 1/2 in BSP threaded ports.
Barry one more question if you don't mind. In Kals instructions he has the volt meter reading the voltage from the boil Phase of the relay to the hot bus. Did you do this? If not where did you take power form for the combo volt and amp meter?
Ok so I can use the wiring thats already in place i.e. a phase from the boil relay -->meter --->hot bus?
© 2024 Created by nzbrewer. Powered by