I have been researching the hell out of setting up the electric brewery and have been buying bits and pieces to get my rig underway, but my issue is what to do next... beside procrastinating!
I have 3kW elements for the HLT and kettle. I am thinking (as per Sparky's comments on the trademe thread) that a temp controller for HLT and a PID for kettle.
Ebay has a couple of cheap PID controllers with Ktype thermos. It also has some thermowells out of the US. (Bling!) While there is a NZ supplier (Thermowellsupply.com) but they are yet to reply to me. I could make my own out of SS tube and SS bolts drilled out, but thermowells / thermocouples make me horny.... I mean look cool and would make the job easier.
Firstly I would like to introduce Frankenframe. Once he was the backbone of a processing conveyor belt worked 20 years for the man, now he is the is reborn as my brewing frame (also known as Rodney). Angled galvanised steel, yet to be painted and completed. Two tiers, and will have wheels etc.
My idea for the rig (the frame is having the final welding done tonight as long as the welder doesn't drink too much of my beer):
And the controller:
I'm looking for feedback, in particular if you have ideas in relation to the controller. (Oops just realised I missed the pump control from the controller, nuts.)
More photos etc to come as Frankenframe goes through the motions to become my brewing rig.
:)