Want to place an ad email luke@realbeer.co.nz
$50+GST / month
Mostly finished the first version of my new control panel. Ended up mostly following the design from http://theelectricbrewery.com/ , considered a bunch of different options but was hard to fault Kal's design. This build is just the base build to control my HLT with a 10a supply, leaving enough room to add in pumps later…
ContinueAdded by Brett Mason on November 25, 2014 at 8:00pm — No Comments
FRESH LIQUID YEAST!!!
DIRECT FROM THE LAB
© 2025 Created by nzbrewer.
Powered by