Want to place an ad email luke@realbeer.co.nz
$50+GST / month

RealBeer.co.nz

Brett Mason's Blog – November 2014 Archive (1)

Control Panel Pt 1

Mostly finished the first version of my new control panel. Ended up mostly following the design from http://theelectricbrewery.com/ , considered a bunch of different options but was hard to fault Kal's design. This build is just the base build to control my HLT with a 10a supply, leaving enough room to add in pumps later…

Continue

Added by Brett Mason on November 25, 2014 at 8:00pm — No Comments

© 2024   Created by nzbrewer.   Powered by

Badges  |  Report an Issue  |  Terms of Service