Want to place an ad email luke@realbeer.co.nz
$50+GST / month
Brewtroller Build:- Plumbing Connections
Plumbing:
First off I must say I'm surprised by the total cost of plumbing this system, it's much more than I would have guessed - but it has to be done.
Side note: I work as a sound engineer now, but actually I did my trade as a plumber so the plumbing side of things is going to be a piece of cake for me - the electronics side is going to be a little more difficult - but…
ContinueAdded by Reuben Rowntree on March 31, 2011 at 1:00pm — 3 Comments
I just got my false bottom back from the sheetmetal workshop so I thought I'd post a few pictures. I bought a sheet of perforated stainless steel sheet from: LockerNZ - http://www.lockernz.co.nz/pdf/catalogues/Perfmetals.pdf
I opted for the P106 which is 2.4mm holes at 3.6mm centres. It comes on a roll which I think was about a metre wide but they sold me just a half metre of that (for about $90), so…
ContinueAdded by Reuben Rowntree on March 22, 2011 at 4:00pm — 3 Comments
© 2025 Created by nzbrewer. Powered by