Want to place an ad email luke@realbeer.co.nz
$50+GST / month
Made a big step towards my goal of going fully electric today. The HLT is now using two 10 amp feeds with two elements and it looks like I have enough power to give a decent boil.
The initial driver to add more power was the 95 minutes it took a single 2kw element to heat about 40 litres up to mash in temperature which is a big delay at the start of brew day. Normally I just heat about 20 litres for mash in which is closer to 40 minutes but I was trying out no sparge…
ContinueAdded by Brett Mason on February 28, 2015 at 9:48pm — No Comments
© 2024 Created by nzbrewer. Powered by